Free Plasterer Quote Template Australia
Create a clear, professional plastering quote using this free template for Australian plasterers.
It can be adapted for plasterboard installation, wall repairs, ceiling repairs, patching, setting, sanding, cornice work, renovation plastering and new-build work.
A good plastering quote should clearly explain the areas being worked on, preparation required, plasterboard or materials being supplied, setting and finishing requirements, labour, waste, inclusions and exclusions.
Want to create plastering quotes faster?
Plastering quotes can involve measurements, labour, board quantities, setting, sanding, access, cornice and plenty of smaller costs.
Jirvo helps Australian tradies create professional quotes and keep those job costs organised in one place.
Create a free quotePlasterer Quote Template
Replace the placeholders and review the example scope for your job. No login needed.
QUOTE
Plastering business details
Business name: [Business Name] ABN: [ABN] Relevant licence number, if applicable: [Licence Number] Phone: [Phone Number] Email: [Email Address] Business address: [Business Address]
Quote details
Quote number: [PLAST-001] Quote date: [Date] Valid until: [Date]
Customer details
Customer name: [Customer Name] Phone / email: [Customer Contact Details] Job address: [Job Address]
Plastering project details
Wall area: [ ] m² Ceiling area: [ ] m² Existing surface: [ ] New plasterboard required: [Yes / No] Repairs required: [ ] Cornice included: [Yes / No] Insulation work included: [Yes / No] Painting included: [Yes / No] Access notes: [ ]
Scope of plastering work
Remove damaged plasterboard from the nominated ceiling area. Supply and install replacement plasterboard to approximately 12 square metres, set joints and fixings, apply required finishing coats, sand ready for painting and remove normal plastering waste from site.
Replace this example with the actual areas being repaired, replaced, sheeted, set and finished.
Plastering pricing
| Description | Qty | Price |
|---|---|---|
| Site setup / protection | 1 | $[ ] |
| Existing plaster removal | [ ] m² | $[ ] |
| Plasterer labour | [ ] hrs / days | $[ ] |
| Additional labour | [ ] hrs / days | $[ ] |
| Plasterboard | [ ] sheets / m² | $[ ] |
| Setting compound | 1 | $[ ] |
| Joint tape | 1 | $[ ] |
| Cornice | [ ] m | $[ ] |
| Fixings | 1 | $[ ] |
| Adhesives | 1 | $[ ] |
| Sanding / finishing | 1 | $[ ] |
| Access equipment | 1 | $[ ] |
| Delivery | 1 | $[ ] |
| Waste disposal | 1 | $[ ] |
| Subcontractors, if applicable | 1 | $[ ] |
| Subtotal | $[ ] | |
| GST, if applicable | $[ ] | |
| Total | $[ ] |
Enter your actual quantities and prices; a quantity of 1 means one bundled allowance. Apply GST only where applicable. Check that removal, board installation, setting, sanding, access and disposal are not counted twice in overlapping allowances.
Inclusions
- Labour for the quoted plastering work
- Removal of damaged plaster where specifically listed
- Supply and installation of listed plasterboard
- Standard fixings
- Joint tape
- Setting compound
- Required setting coats
- Sanding of the quoted work
- Cornice where specifically listed
- Job-related clean-up
- Waste removal where included
These are example inclusions. Customise them for each job.
Exclusions
- Painting unless specifically included
- Electrical work
- Plumbing work
- Structural repairs
- Roof leak repairs
- Mould remediation
- Asbestos-related work
- Water-damage repairs outside the described scope
- Framing repairs unless specifically included
- Insulation unless included
- Repairs to concealed damage
- Work outside the quoted areas
- Additional access equipment unless specifically included
Damaged plaster can hide other issues that are not visible before work begins. Adapt exclusions to the actual scope; this list does not remove applicable obligations.
Assumptions
This quote assumes existing framing, substrates and surrounding areas are generally suitable for the described plastering work unless otherwise stated. Concealed damage or additional repairs discovered after removal begins will be discussed with the customer before additional work proceeds.
Variations
Any work requested or required outside the agreed scope will be discussed with the customer before proceeding and may result in an additional charge.
Examples include additional damaged areas, extra plasterboard replacement, additional setting, framing repairs, extra cornice, changes to ceiling areas and additional access requirements.
Payment terms
Deposit: [ ] Progress payment: [ ] Final payment: [ ]
Payment terms depend on the individual business and job and must suit applicable requirements. No mandatory deposit percentage is recommended here.
Quote validity
This quote is valid until [DATE]. Plasterboard, compounds, cornice and other supplier pricing may need to be reviewed after this date.
Customer acceptance
I accept the scope, price and terms contained in this quote.
Customer name: ____________________ Signature: ____________________ Date: ____________________
Scope of plastering work
Clearly describe the areas being repaired, replaced, sheeted, set and finished. The example scope in the template identifies the nominated ceiling area, replacement board, joints, fixings, finishing coats, sanding and waste removal.
Compare this with Repair ceiling — $2,800. That amount is illustrative only, not a recommended price. The detailed scope gives the customer a much clearer understanding of what is included, which areas are covered and whether painting is a separate responsibility.
Common plastering jobs this template can be used for
- Plasterboard installation
- Ceiling replacement
- Ceiling repairs
- Wall repairs
- Hole repairs
- Water-damaged plaster replacement
- Renovation plastering
- New wall sheeting
- New ceiling sheeting
- Setting and sanding
- Cornice installation
- Cornice repairs
- Patch repairs
- Bulkhead plastering
- Garage plastering
- New-build plastering
- Commercial plastering
- General maintenance plastering
Adjust every plastering quotation template to the actual project. A wall repair quote or ceiling repair quote needs different quantities and assumptions from a new plasterboard installation.
What should plasterers consider when pricing a job?
Check wall area, ceiling area, plasterboard quantity and board type. Review existing plaster removal, visible framing condition, setting, sanding, cornice, fixings, adhesive and joint tape.
Allow for access, ceiling height, scaffolding or access equipment, delivery and waste. Estimate labour and additional workers, travel, supplier trips, administration, business overheads and profit margin. Check where each cost is recovered so the same work is not counted twice.
Use 10 Costs Tradies Forget When Quoting Jobs as a checklist and read How Much Should a Tradie Charge Per Hour in Australia?. The free hourly-rate calculator uses your own business figures.
Measure plasterboard areas carefully
Plasterboard requirements often start with measuring wall and ceiling areas. For a simple wall: Length × Height = Area in square metres.
For example, 5 m × 2.4 m = 12 m². Consider doors, windows, multiple walls and ceiling areas separately. Check actual measurements, sheet dimensions and the job layout before ordering. This plasterboard quote template is not a material calculator.
Don't forget cuts and material waste
Plasterboard purchased may be greater than the exact finished area because of sheet dimensions, cuts, offcuts, damaged sheets, openings, layout, corners and transport damage.
The appropriate allowance depends on the job. No universal material-waste percentage is recommended here.
Ceiling work can take longer than wall work
Overhead work, access, sheet handling, props or lifting equipment, lighting and penetrations, sanding overhead and higher ceilings can add time to a ceiling job.
Assess the actual work and access requirements rather than applying a universal ceiling rate. This is a costing checklist, not a safety-system or structural specification.
Don't underestimate setting and sanding
Hanging plasterboard is only part of the job. Finishing may involve taping joints, multiple compound applications, drying time, internal corners, external corners, fixing heads, sanding and a final inspection.
Account for the complete finish required, not just board installation. Include return visits where your work plan needs them; this template does not prescribe drying times or installation methods.
Clearly state whether cornice is included
Cornice work may involve removal of existing cornice, new cornice supply, cutting, mitres, adhesive, setting and repairs to adjoining surfaces.
State whether cornice is included or excluded, identify the areas and profile being priced, and check that its labour and materials are not also counted in another allowance.
Small plaster repairs still have setup costs
A small hole may use very little material but still require travel, site protection, cutting, backing, plasterboard, setting, return visits, sanding and clean-up.
A small repair should not necessarily be priced only by material quantity. Use your actual costs and work plan; no specific minimum charge is recommended here.
Should plasterers mark up materials?
Supplying plasterboard, cornice, compounds and fixings involves more than the supplier purchase price. Measuring quantities, ordering, collecting, coordinating delivery, transporting sheets, handling damaged material and returning unused products take time and resources.
No fixed markup percentage is recommended. Read How to Mark Up Materials on a Trade Quote and check that handling or delivery has not already been recovered elsewhere.
Should plasterers charge hourly or quote a fixed price?
Hourly pricing may suit small repairs, unknown damage, investigation work, maintenance or jobs where the full scope cannot initially be confirmed. Fixed-price quoting may suit new plasterboard installation, a known ceiling replacement, defined renovation work, clearly measured wall areas or new-build work.
Even when giving a fixed price, understand your internal labour rate. Read How Much Should a Tradie Charge Per Hour in Australia?. If you are considering a plastering estimate template because the scope remains uncertain, read Quote vs Estimate: What's the Difference for Tradies? before deciding how to present the price.
Example plasterer quote
The business, customer and ABN below are fictional placeholders. All amounts are AUD. For this example only, assume a GST-registered business making a wholly taxable sale at 10% GST, with component prices excluding GST. No discount or additional fee applies. The plasterer labour line covers board installation and setting; sanding and finishing is a separate labour allowance, and removal includes its own labour. Board and setting-material lines are supply allowances. These assumptions avoid charging for the same work twice; adapt them to your actual job.
QUOTE
Illustrative quote details
Coastline Plastering
ABN: 12 345 678 901 (fictional placeholder, not a valid ABN) Quote: PLAST-1094 Customer: Sarah Mitchell Job: Damaged ceiling replacement
Scope
Remove approximately 12 square metres of damaged ceiling plasterboard.
Supply and install replacement plasterboard to the nominated area.
Set joints and fixings, apply finishing coats and sand ready for painting.
Remove normal plastering waste from site.
Example pricing
| Description | Qty | Price |
|---|---|---|
| Site setup and protection | $180 | |
| Existing plaster removal | $420 | |
| Plasterboard materials | $480 | |
| Plasterer labour | $1,450 | |
| Setting materials and consumables | $260 | |
| Sanding and finishing | $380 | |
| Waste disposal | $160 | |
| Subtotal | $3,330 | |
| GST | $333 | |
| Total | $3,663 |
These amounts are illustrative examples only and are not recommended Australian plastering rates.
Exclusions
Painting, structural framing repairs, electrical work, roof leak repairs and concealed damage are excluded unless specifically included.
Any additional work will be discussed before proceeding.
What should you check before quoting a plastering job?
Confirm wall area, ceiling area and ceiling height; existing material, visible damage and removal requirements; plasterboard quantity, board type, visible framing condition and access.
Check cornice, setting, sanding, openings, lighting penetrations, delivery, waste and labour. Confirm painting responsibility and clean-up, then review the final inclusions, exclusions and assumptions.
Related quote templates
For other jobs, try the Painter Quote Template, Tiler Quote Template, Carpenter Quote Template or Roofer Quote Template. The Free Tradie Quote Template Australia provides a flexible starting point, or browse all templates.
Want to create plastering quotes faster?
Plastering quotes can involve measurements, labour, board quantities, setting, sanding, access, cornice and plenty of smaller costs.
Jirvo helps Australian tradies create professional quotes and keep those job costs organised in one place.
Create a free quote